The finance-first alternative to Autodesk Construction Cloud for EPC & capital projects
If you bought Autodesk Construction Cloud, BIM 360 or Procore and your CFO still can't see real-time BOQ vs actual across sites — you didn't buy the wrong tool, you bought the wrong category. ACC is a design-collaboration platform. Deepsa AI ERP is a money-leak prevention platform. Most customers use both.

What Autodesk Construction Cloud is great at
BIM, 3D coordination, drawing version control, RFIs, submittals and design handoffs. If your problem is "architects, engineers and contractors can't share a single model", ACC is excellent — and you should keep it.
What Autodesk doesn't do — and what it costs you
Material leakage silently erodes 3–8% of project cost. On a ₹500 Cr EPC project that is ₹40–70 Cr, and no amount of BIM coordination stops it. Deepsa AI closes exactly that gap:
- Generates a 96%+ accurate BOQ from your Revit / AutoCAD / IFC / PDF drawings in hours.
- Matches every indent, PO, GRN and vendor invoice against the BOQ line in real time.
- Catches leakage before the vendor invoice is paid — not weeks later in an Excel reconciliation.
- Shows a CFO live planned-vs-actual across 12 sites in one PowerBI-native dashboard.
- Auto-generates DPRs at 6 PM daily without site engineers typing a word.
Feature-by-feature comparison
| Capability | Autodesk Construction Cloud | Deepsa AI ERP |
|---|---|---|
| Primary user | Design & BIM teams | CFO, procurement, PMC & operations |
| BIM / 3D model coordination | Excellent (Revit-native) | Ingests ACC / Revit output |
| AI BOQ from drawings | Not offered | 96%+ accuracy, auto-generated |
| BOQ vs actual reconciliation | Manual exports | Real-time indent / PO / GRN / invoice matching |
| Material leakage prevention | No | AI anomaly detection before invoice payment |
| Daily progress reports (DPR) | Manual field entry | Auto-generated at 6 PM, no typing |
| SAP / Oracle / Tally integration | Connector-heavy | Native overlay, no rip-and-replace |
| Multi-site CFO dashboards | Add-on BI required | PowerBI-native, built-in |
| WhatsApp / voice alerts to vendors & PMCs | No | Native autonomous agents |
| Time to live for finance layer | Months | 14–21 days |
BIM coordination vs BOQ leakage prevention
These are different categories solving different P&L problems. ACC protects the design-to-field handoff; Deepsa protects the margin. The highest-performing EPC firms run ACC for design teams and overlay Deepsa AI for finance, procurement and operations — Deepsa ingests the ACC / Revit drawings as input and pushes BOQ and variance intelligence back into your SAP, Oracle Primavera or Tally environment with no rip-and-replace.
When Autodesk alone is enough
If your only pain is design coordination and drawing management, ACC alone is fine. Add Deepsa AI the moment leakage, BOQ accuracy or ERP reconciliation shows up in a board review — typically the first time a ₹3+ Cr variance is discovered after payment.
Migration & integration path
Deepsa AI connects to your existing ACC project data and ERP masters and goes live in 14–21 days. Site teams keep Autodesk; finance gets the AI control layer. Compare with our Deepsa AI vs Procore and Oracle Primavera overlay breakdowns, or read the 2026 AI takeoff benchmark.
SAP and Oracle Primavera integration for Autodesk users
Most Autodesk Construction Cloud customers in EPC and capital projects already run SAP for procurement and finance, or Oracle Primavera P6 for programme scheduling. Deepsa AI is designed as an overlay that reads ACC / Revit / IFC drawings and writes BOQ, variance and reconciliation data back into those systems — no rip-and-replace required.
- SAP integration: AI BOQ lines are mapped to SAP purchase requisitions and purchase orders, so procurement teams see the same quantities in ME2N / ME23N while Deepsa flags leakage before MIRO invoice verification.
- Oracle Primavera P6 integration: BOQ quantities and WBS codes from ACC / Revit drawings are linked to Primavera activities, so material variance alerts are tied to the actual schedule baseline and activity slips.
- ACC / Revit ingestion: Deepsa reads published 2D sheets, 3D IFC exports and design revisions from Autodesk Construction Cloud as the source of truth for quantities.
- Unified CFO view: Planned vs actual cost, schedule-linked material consumption and pending invoice leakage are shown in one PowerBI-native dashboard fed by SAP, Primavera and Deepsa AI.
This means design teams continue collaborating in ACC, planners keep Primavera P6 as the schedule system of record, and procurement stays in SAP — while finance gets an AI layer that closes the material leakage gap between all three.
See it on your own drawings
Send one project. In 5 working days we return the AI BOQ, the accuracy delta vs your QS take-off, and the estimated leakage against your POs.