Concrete Calculator

Convert any slab, beam, column or footing into exact cement bags, sand, aggregate, water and steel for M5 to M30 nominal mixes — with wastage and live material cost. Built by Deepsa AI for EPC, real estate and infrastructure teams that reconcile BOQ against actual consumption.

Concrete inputs

Concrete grade

Nominal mix 1 : 1.5 : 3 · w/c 0.5

Structural element

Material requirement

Wet volume of concrete
12.00 m³ (423.8 cft)
Dry volume (×1.54 + wastage)
19.40 m³
Cement required
101.6 bags · 5080 kg
Sand (fine aggregate)
5.29 m³ (186.9 cft)
Coarse aggregate
10.58 m³ (373.8 cft)
Water (approx.)
2540 litres
Steel estimate (Slab)
960 kg
Material cost
₹68,119
Sites without live BOQ-versus-consumption reconciliation lose 4–8% of cement and aggregate to unrecorded indents and rework. Deepsa AI sits over SAP Project System, Oracle Primavera and Tally ERP and closes that loop at 96%+ accuracy.

How concrete quantities are calculated

Wet volume is length × width × thickness. Because dry cement, sand and aggregate contain voids that close on mixing and compaction, the wet volume is multiplied by 1.54 to get dry volume. That dry volume is divided in the nominal mix proportion of the selected grade; the cement share is converted to bags at a bulk density of 1,440 kg/m³ (50 kg per bag), and water is derived from the grade's water–cement ratio.

Nominal mix ratios (IS 456)

GradeCement : Sand : AggregateCement bags / m³Typical use
M51 : 5 : 102.77Levelling course, PCC bedding
M7.51 : 4 : 83.41Levelling course, PCC bedding
M101 : 3 : 64.44PCC, non-structural fills
M151 : 2 : 46.34Flooring, kerbs, light footings
M201 : 1.5 : 38.06Slabs, beams, residential RCC
M251 : 1 : 211.09Columns, commercial RCC
M301 : 0.75 : 1.513.65High-rise columns, industrial floors

Where concrete leakage actually happens

  • Ordered quantity is estimated per pour, but never reconciled back to the approved BOQ line item.
  • Cement bags issued against verbal indents are recorded days later, if at all.
  • Rework and rejected pours are absorbed as "site consumption" instead of a variance.
  • Legacy ERP closes the month after the concrete has already cured.

Read the construction material management guide or see how the overlay works on industrial construction projects.